Power plant cost per unit (merit order)
The cost per unit of electricity on which Pakistan's grid dispatches each thermal power plant (fuel + variable O&M + other), Rs per kWh, for every thermal power plant in ISMO's Economic Merit Order (dimensions plant and fuel), at each revision since June 2024.
Latest values · 13 Oct 2026
| Plant | Rs/kWh |
|---|---|
| UCH (Gas, up to 152,375 MWh) | 3.11 |
| Thar Coal Block-I (Coal) | 5.38 |
| Engro Thar (Coal) | 5.80 |
| Thar Energy (Coal) | 5.82 |
| Thal Nova Thar (Coal) | 5.82 |
| Liberty Power Daharki (Gas, up to 61,904 MWh) | 5.94 |
| Guddu 747 (Gas, CC) | 9.69 |
| Foundation Power Daharki (Gas) | 11.20 |
| Engro Qadirpur (Gas (PG)) | 11.69 |
| UCH (Gas, above 152,375 MWh) | 11.95 |
| Lucky Electric (Coal) | 12.75 |
| Haveli Bahadur Shah (NPPMCL) (Domestic gas, CC) | 12.90 |
| Balloki (NPPMCL) (Domestic gas, CC) | 13.05 |
| Bhikki (QATPL) (Domestic gas, CC) | 13.11 |
| Trimmu (Punjab Thermal) (Domestic gas) | 13.42 |
| Guddu 747 (Gas, OC) | 13.87 |
| UCH-II (Gas) | 14.30 |
| Orient Power (Domestic gas) | 16.00 |
| Nandipur (Domestic gas, CC) | 16.25 |
| Halmore Power (Domestic gas) | 16.53 |
| Sapphire Electric (Domestic gas) | 16.56 |
| Saif Power (Domestic gas) | 16.58 |
| China Power Hub (Coal) | 17.10 |
| Kot Addu (KAPCO) (Domestic gas, Block I) | 17.22 |
| Jamshoro Coal (Coal) | 17.47 |
35 more rows (smaller districts, tehsils and other breakdowns) — every row via /v1/series/energy.power.merit_order.specific_cost?dims=… with a free key.
About this series
The cost per unit of electricity on which Pakistan's grid dispatches each thermal power plant (fuel + variable O&M + other), Rs per kWh, for every thermal power plant in ISMO's Economic Merit Order (dimensions plant and fuel), at each revision since June 2024.
Use cases
- Chart power plant cost per unit (merit order) and its full history in a dashboard or research note
- Track fuel or power costs with power plant cost per unit (merit order)
- Model the generation mix or a plant's output from power plant cost per unit (merit order)
- Pull power plant cost per unit (merit order) into your stack as JSON or CSV
Who uses this
- Energy & power analyst
- Logistics / fleet planner
- Economist
- Journalist
Metadata
| Series ID | energy.power.merit_order.specific_cost |
|---|---|
| Source | ISMO |
| Unit | Rs/kWh |
| Frequency | Irregular |
| First observation | 01 Jun 2024 |
| Last observation | 13 Oct 2026 |
| Tier | basic |
Fetch it
curl -H "X-API-Key: pk_live_xxx" \
"https://api.pakdatahub.com/v1/series/energy.power.merit_order.specific_cost"
JSON by default; add ?format=csv for CSV, from/to to filter dates, or transform=yoy|mom|pct_change|3ma|index for server-side transforms. See the series endpoint docs and pricing.
Related series
- Dependable capacity by power plant
energy.capacity.dependable - Installed capacity by power plant
energy.capacity.installed - High-speed diesel — PSO retail price
energy.fuel.diesel - Diesel price in US dollars (per litre)
energy.fuel.diesel.usd - E10 gasoline — PSO retail price
energy.fuel.e10 - Jet fuel (JP-1) — PSO price
energy.fuel.jp1 - Kerosene oil (SKO) — PSO retail price
energy.fuel.kerosene - Light diesel oil (LDO) — PSO retail price
energy.fuel.ldo - Petrol (motor spirit) — PSO retail price
energy.fuel.petrol - Petrol price in US dollars (per litre)
energy.fuel.petrol.usd - Electricity generation by source
energy.generation.by_source - Electricity generation by power plant
energy.generation.plant
FAQ
What is Power plant cost per unit (merit order)?
The cost per unit of electricity on which Pakistan's grid dispatches each thermal power plant (fuel + variable O&M + other), Rs per kWh, for every thermal power plant in ISMO's Economic Merit Order (dimensions plant and fuel), at each revision since June 2024.
Does PakDataHub have Pakistan energy and fuel-price data on Power plant cost per unit (merit order)?
Yes. Power plant cost per unit (merit order) is an official Pakistan energy and fuel-price time series (irregular, from ISMO) available on the PakDataHub API, covering 2024 to 2026. Query it as JSON or CSV at /v1/series/energy.power.merit_order.specific_cost, with server-side transforms (YoY, index, % change).
How far back does Power plant cost per unit (merit order) go?
PakDataHub carries Power plant cost per unit (merit order) covering 2024 to 2026, updated on a irregular basis from ISMO.
How do I get Power plant cost per unit (merit order) via the API?
Call GET /v1/series/energy.power.merit_order.specific_cost with your API key. Add ?format=csv for a download, or filter by date with from/to.